What we build · New Construction
Designed From the Elevation Upward
A new house on a Gulf coast lot, designed from the required finished floor elevation upward.
The property, its age, and what you are contemplating. We will tell you whether it is a renovation or a rebuild before anybody draws anything.
50%
The rule that turns a renovation into a rebuild
Half empty
A seasonal house is unoccupied for months at a time
Elevation
What you can build is decided before you draw it
Licensed
General contractor, licensed in the state of Florida
The elevation shapes the architecture
Required finished floor elevation determines how high the house sits, which decides the entry sequence, the stairs, what the space below can be used for, and how the building meets the street. Architects who resolve that first produce a house that looks intentional; those who add it later produce one on stilts.
Elevation also interacts with the community's own rules. Many Gulf coast associations have height limits measured from grade, and a house raised to meet a flood requirement can find itself constrained at the top by a covenant written before the elevation requirement existed. The two have to be reconciled before design, not during review.
What the site imposes
- Required finished floor elevation and any local freeboard.
- Setbacks and any coastal construction line.
- Wind loading at an exposed Gulf-front site.
- Salt exposure on every fixing and fitting.
- Community architectural review, which is real here.
Designing the underside
On an elevated house the space below the finished floor is what somebody sees from the street before they see the house. Left as exposed piles and a slab it reads as unfinished; treated as architecture — with proper enclosure, materials and lighting — it reads as intentional.
What can be done there is constrained by the flood zone, which limits use and construction. Working within those limits deliberately is the difference between a house that sits comfortably on its lot and one that appears to be on stilts.
How we handle it
- 01Establish elevation and setbacks before design starts.
- 02Design the ground-level condition deliberately.
- 03Specify for salt exposure throughout, concealed fixings included.
- 04Coordinate with community architectural review early.
- 05Build to the wind requirements for the specific site.
Design what happens under the house as carefully as what happens in it. On an elevated Gulf coast home the underside is the most visible part from the street, and treating it as a by-product of the elevation is how a good house ends up looking like it is on stilts.
Said plainly
Where we stop
Setbacks and coastal construction lines are not negotiable through design. We establish them before a site is committed to rather than after.
FAQ
Common questions
- How high does the house have to be?
- Set by flood zone, base flood elevation and any local freeboard. Establish it before designing.
- Does the elevation affect the architecture?
- Substantially. Resolve it first or the design changes.
- Is architectural review real here?
- In many Gulf coast communities, yes, and it should be engaged early.
- Does salt change the specification?
- Throughout, including concealed fixings.
Local specifics
The Improvement Rule
50 percent rule substantial improvement florida flood zone
Read more →
Seasonal Homes
seasonal home closed summer humidity mold florida gulf
Read more →
Architectural Review
naples HOA architectural review approval community design
Read more →
Gulf Exposure
gulf coast salt exposure corrosion home construction naples
Read more →
How We Work Here
fort lauderdale builder naples gulf coast travel
Read more →
Next step
Find out what is actually wrong with it.
An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.